Projet H.225
Organisation
Risks management
| ID | Risk title | Risk description | Risk Mitigation | |
|---|---|---|---|---|
| Système | ||||
| SYS1 | Protocol | The customer protocol is specified in detals | ||
| Environnementaux | ||||
| ENV1 | Temperature survival | The system must work at 70°C and must survive at 85°C during 30 minutes | Simulation of the system. Providing power consumption constraints. Check that the constraints allow to achieve functionality | |
| Logiciel | ||||
| SW1 | ||||
| Hardware | ||||
| HW1 | ||||
| FPGA | ||||
| FP1 | Overload | There is a lot of FPGA modification and creation | ||
| Production / Test | ||||
| PRD1 | ||||